|
Zhoushan Island-Connection
Project is one section of the horizontal among the
Zhejiang Expressway Plan "two vertical, two horizontal,
eighteen connection, three around and three passage".
The second phase is composed of Jintang Bridge, Xi
Houmen Bridge and its link line, with a length of
32.1 km and total investment of 9.15 billion RMB.
|